Mechanical Engineer (Fresher)

August 24, 2024

Job Overview

  • Date Posted
    August 24, 2024
  • Location
  • Expiration date
    September 23, 2024
  • Experience
    Fresh

Job Description

Job Description

Job Responsibilities

Design-

Proficiency with engineering design programs such as AutoCAD, Solidworks, and Rhino.

Sound knowledge of design and engineering principles and best practices.

Strong analytical and problem-solving abilities.

Exceptional time management and organizational skills.

Excellent verbal and written communication abilities.

Attentive to detail and critically minded.

The ability to stay abreast of advancements in technology and engineering design trends.

  • QA/QC- Prepare and regularly (weekly) submit reports and maintain records Manage the quality assurance/quality control function on-site on various project phases Prepare project site related reports and presentations as required and produce performance measurement tools to monitor the Contractor’s and project performance Ensure that the approved Inspection and Test Plan (ITP) and Method Statements are implemented by the Contractor on site and the particular hold points required are coordinated with the Project Team. Conduct Quality or technical compliance audits for Contractor, Sub Contractor or Vendors.
  • Production- Develop a deep understanding of the types of valves produced by the company, including their specifications, applications, and quality standards Implement and enforce strict quality control measures to ensure that valves meet industry standards and customer requirements. Work closely with the planning and scheduling team to develop production plans that meet customer demand while optimizing resources and minimizing lead times. Develop production schedules and plans to meet customer requirements and organizational goals. This involves coordinating with different departments to ensure the availability of resources, such as manpower, materials, and equipment Prepare and regularly (weekly) submit reports and maintain records Manage the quality assurance/quality control function on-site on various project phases Prepare project site related reports and presentations as required and produce performance measurement tools to monitor the Contractor’s and project performance Ensure that the approved Inspection and Test Plan (ITP) and Method Statements are implemented by the Contractor on site and the particular hold points required are coordinated with the Project Team Conduct Quality or technical compliance audits for Contractor, Sub Contractor or Vendors